From: | November 2021 | To: Till Present |
Employer: | UBM Uluslararası Birleşmiş Müşavirler Müşavirlik Hizmetleri A.Ş. | |
Positions held: | QC Engineer/Highway Engineer |
From: | April 2021 | To: Luly 2021 |
Employer: | IRD Ltd Branch Geogia | |
Positions held: | Material Specialist/Road Engineer |
From: | June 2020 | To: Dec 2020 |
Employer: | HNRB Construction Group Co., Ltd | |
Positions held: | QA QC Manager-Engineer | |
From: | March 2020 | To: June 2020 |
Employer: | SGS Georginan Brand | |
Positions held: | Civil/Structural Engineer | |
From: | May 2019 | To: March 2020 |
Employer: | Todini Costruzioni Generali Spa | |
Positions held: | QA QC Manager | |
From: | July 2018 | To: March 2019 |
Employer: | IGH Institute | |
Positions held: | QA QC Specialist | |
From: | Jan 2018 | To: June 2018 |
Employer: | CPower | |
Positions held: | Civil Engineer |
From: | May 2017 | To: December 2017 |
Employer: | Bureau Veritas | |
Positions Lead held: | Civil Engineer |
From: | February2016 | To: April 2017 |
Employer: | MottMacDonald | |
Positions held: | Civil Surface Work Inspector |
From: | April 2014 | To: February 2016 |
Employer: | Peri Ltd | |
Positions held: | QA QC Manager |
From: | Nov 2012 | To: March 2014 |
Employer: | China Nuclear Industry 23 Construction Co., Ltd | |
Positions held: | QA Manager |
From: | April 2010 | To: September 2012 |
Employer: | UDC Ltd | |
Positions held: | Technical Manager |
From: | Jan 2007 | To: April 2010 |
Employer: | Arali Ltd | |
Positions held: | Construction Project Manager |
From: | Sep 2003 | To: Sep 2006 |
Employer: | AmecSPIE JV | |
Positions held: | QA QC Supervisor |
From: | Apr 1999 | To: Sep 2003 |
Employer: | Georgian Automobile Federation | |
Positions held: | Manager of “Test & Driving School” |
|
|
Name of Assignment or Project: Supervision of construction works for upgrading E-60 highway section F2: Khevi-Ubisa 12 km section of the E-60 highway funded by World Bank Month & Year: June 2020 ~ December 2020 Location: Georgia Client: Department of Roads of Georgia Main Project Features: All QA QC Issues, Supervise construction activities (etc. Road, Bridges, Tunnels, Interchanges, Culverts, Retaining walls) for E-************* km section (Bank harmonized FIDIC Contracts), ************ km/hr. design speed. Project cost: GEL 780 million. Positions Held: Civil/Structural Engineer Activities Performed: Took over and converted all the digital data of the Terminal construction implementation,
_______________________________________________________________ Name of Assignment or Project: Construction Supervision of the Batumi Port Fertilizer Terminal funded by World Bank Month & Year: March 2020 ~June 2020 Location: Georgia Client: Infrastructure Ministry of Georgia Main Project Features: The project encompassed supervision over the construction works of the Batumi Port Fertilizer Terminal, all Civil works, etc.
(Bank harmonized FIDIC Contracts) Project cost: US$ 90 million. __________________________________________________________________________ Positions Held: QA QC Manager Activities Performed: Took over and converted all the digital data of the Project design into the adaptable software in aim of checking the elevations and offsets in course of design review, construction implementation, verification of quantities and checking “as built” drawings of the contractor; assisted in design review; obtained and verified the geodetic benchmarks and survey data both on the ground and digital design provided; confirmed the road geometric parameters on the site; calculated the quantities of the accomplished works against the contract documents and assisted in elaborating the decisions regarding interim payments to the contractor. | |
Name of Assignment or Project: Temporary Assignment for Supervision of Construction Works of Rehabilitation of Batumi - Zarzma Road) funded by ADB Month & Year: May 2019 ~ march 2020 Location: Georgia Client: Department of Roads of Georgia Main Project Features: The project encompassed supervision over the construction works of all three lots (45 km, from km 80 to km125, Batumi-Zarzma Road section) of Rehabilitation project.
Project cost: GEL 134,5 million. Road 45 km, (Bank harmonized FIDIC Contracts), *********** km/hr. design speed _______________________________________________________________________ Positions Held: QA QC Specialist Activities Performed: Took over and converted all the digital data of the road design into the adaptable software in aim of checking the elevations and offsets in course of design review, construction implementation, verification of quantities and checking “as built” drawings of the contractor; assisted in design review; obtained and verified the geodetic benchmarks and survey data both on the ground and digital design provided; confirmed the road geometric parameters on the site; calculated the quantities of the accomplished works against the contract documents and assisted in elaborating the decisions regarding interim payments to the contractor.Name of Assignment or Project: Rehabilitation of Roads, Bridges, Tunnel around Georgia funded by ADB Month & Year: July 2018 – March 2019 Location: Georgia Client: Road Department of Georgia Main Project Features: Supervision of all Roads, Bridges, Tunnels and Pedestrian Construction process all around Georgia (Bank harmonized FIDIC Contracts), Positions Held: Supervisor Activities Performed: Overall supervision of construction of sub grade capping layers, sub base, base course, cement concrete binding and wearing courses, review of drawings, IPCs, reporting. _______________________________________________________________________Name of Assignment or Project: Construction if Coal Powered Electrical Station Gardabani, Georgia Month & Year: Jan 2018 ~ June 2018 Location: Georgia Client: GIG Main Project Features: Civil engineering issues during to Construction of Blok No.10 Positions Held: Civil Engineer Activities Performed: Overall supervision of Geotechnical works; Checked and controlled design benchmarks and geodetic points; coordinated and supervised the assigned staff of the company and ensured performance of the civil works according to the shop drawings approved;ensured adherence to the best practices for works safety;supervised and ensured conduct of requested tests and lab analysis for materials and workmanshipliaison with Supervising Engineer and ensured all the reasonable requests for essential tests and calculations were secured;led on-site records regularly for quantities of performed works and report according to the methods of measurements approved; assisted in preparing relevant claims and notifications.Name of Assignment or Project: Construction of Dry Line Cement Factory Month & Year: May 2017 ~ Dec. 2017 Location: Georgia Client: Heidelbergcement Main Project Features: Supervision of all Civil works, etc. Excavation, leveling, steel bars installation, formworks installation, concrete pouring all procedures, backfill, pile worksPositions Held: Lead Civil Engineer Activities Performed: Supervision of the team of technicians in view of liaison and dealing with supervising consultant of the executing agency, including and not limited to the following performance: Reviewed the design specifications and coordinated and obtained approval for the quality assurance standard applied; developed, and submitted to approval the schedule and procedures for certification, testing, measuring and verifying the goods and workmanship delivered; ensured implementation of the schedule approved; developed and followed up with implementation of internal reporting procedures; ensured maintenance of onsite records; reviewed the shop drawings submitted and keep the track of work performance; reconciled the quantities checked with the supervisor; coordinated supervision of field and laboratory tests required for material, goods and workmanship; as well as clarifying and addressing the issues, discrepancies and incompliance notified by the supervision engineer._______________________________________________________________________Name of Assignment or Project: Construction of Shuakhvi HPP Month & Year: February 2016 ~ April 2017 Location: Georgia Client: ADL Main Project Features: Construction works of dams, roads, tunnels power house Positions Held: Road Engineer Activities Performed: Supervision of the assigned team of dams technicians, operators and specialists on the site in view of meeting requirements of job description and standard quality and performance procedures in force, including but not limited to the following activities: In coordination with Resident Engineer schedule and implemented on-site construction activities; followed the shop drawings, standard guidelines and instructions to ensure on-time performance and quality of assigned construction activities; led and maintained on-site daily records time sheets; reported on daily, weekly and monthly base according the adopted format and procedures. |
Name of Assignment or Project: Accommodation Addition Construction Project
Month & Year: April 2014 – February 2016
Location: Georgia
Client: BP Georgia
Main Project Features:
Manage of QA QC Issues, Working with BS, EN, GOST, Construction PSG-2 of BP Pipeline Accommodation Addition, Quality Control of all of Construction works (Construction, Electrical, Mechanical, Structural, Pipeline, Installation of Equipment and Furniture) GOC Control.
Positions Held: QA QC Manager
Activities Performed: Supervision of the team of technicians in view of liaison and dealing with supervising consultant of the executing agency, including and not limited to the following performance:
Name of Assignment or Project: China Nuclear Industry 23 Construction Co., Ltd.
Month & Year: November ****************
Location: Georgia
Client: Road Department Georgia
Main Project Features:
Supervision of construction works for upgrading E-60 highway section Ruisi-Agara: Khevi-Ubisa 17 km section of the E-60 highway funded by World Bank
Positions Held: Road/Highway Engineer
Activities Performed: Supervision of the assigned team of dams technicians, operators and specialists on the site in view of meeting requirements of job description and standard quality and performance procedures in force, including but not limited to the following activities:
In coordination with Resident Engineer schedule and implemented on-site construction activities; followed the shop drawings, standard guidelines and instructions to ensure on-time performance and quality of assigned construction activities; led and maintained on-site daily records time sheets; reported on daily, weekly and monthly base according the adopted format and procedures.
Name of Assignment or Project: Materials Supply Project
Month & Year: April 2010 – September 2012
Location: Georgia
Client: BP Georgia
Main Project Features:
Manage of heavy equipment and trucks control, diesel control during Construction Buildings.
Positions Held: Technical Manager
Activities Performed: Developed, and submitted to approval the schedule and procedures for certification, testing, measuring and verifying the goods and workmanship delivered; ensured implementation of the schedule approved
__________________________________________________________________________________________
Name of Assignment or Project: Arali Ltd
Month & Year: January****************
Location: Georgia
Client: BP
Main Project Features:
Supervision and construction works for Construction of permanent access roads for BP Pipeline Block Valve Stations, Construction Security Base Bridges, culverts, fences funded by BP Georgia
Positions Held: Construction Project Manager
Activities Performed: Supervision of the assigned team of road technicians, operators and specialists on the site in view of meeting requirements of job description and standard quality and performance procedures in force, including but not limited to the following activities:
In coordination with Resident Engineer schedule and implemented on-site construction activities; followed the shop drawings, standard guidelines and instructions to ensure on-time performance and quality of assigned construction activities; led and maintained on-site daily records time sheets; reported on daily, weekly and monthly base according the adopted format and procedures.